2-14 CP2000 Setup Guide
020-100070-01 Rev. 1 (10/08)
Section 2: Installation and Setup
FIGURE 2-20 CONNECT INCOMING GROUND WIRE
3. Refer to the Terminal Block 1 (TB1) Connections diagram provided on the inside of the pedestal
door (operator's side). As described for your model and site, connect all available wires to the large
terminal block (TB1) located in the operator's side of the pedestal.
NOTES: 1) The Terminal Block 1 (TB1), described below accommodates up to 6 AWG wire. 2) For
proper torque, a flat screwdriver with 4-6mm blade is recommended. 3) Refer to the Terminal Block 1
(TB1) Connections diagram located in the pedestal.
180-235 VAC (N. America, Japan, most of Central/South America, etc.):
If 3-phase and single-phase feeds (6-wire):
Ensure ground wire is connected directly to the frame ground lug on the pedestal floor.
Attach no other wires here.
Connect L and N @ 200-230 VAC (single-phase)
Connect 1, 2, and 3 @ 180-235 VAC (3-phase)
If 3-phase with neutral fed from 3-phase (5-wire):
Ensure ground wire is connected directly to the frame ground lug on the pedestal floor.
Attach no other wires here.
Connect 1, 2, 3, and N @ 180-235 VAC (3-phase)
No L available. Connect jumper from 1 to L.
If 3-phase only (4-wire):
Ensure ground wire is connected directly to the frame ground lug on the pedestal floor.
Attach no other wires here.
Connect 1, 2, and 3 @ 180-235 VAC (3-phase)
No L or N available, so the internal outlet will not be functional.