Section 2: Installation and Setup
NOTE: There is no need to adjust leveling and/or tilt at this point. Wait until all other components are
mounted/installed. For more information, refer to 2.4
Adjust Tilt and Leveling.
FIGURE 2-3 ADJUST FEET
INSTALL TPC
1. Attach the Touch Panel Controller, pre-assembled with its
ball joint base and mounting arm, to the matching ball
joint base secured at the rear of the projector (Figure 2-4
Typical TPC Mount).
2. Connect to the TPC cable routed through the nearby hole
in the projector rear. The other end of this cable is pre-
connected to the internal Ethernet hub and the 24V power
supply.
If desired, you can mount the TPC and its 24V power supply
elsewhere at the site. Route the TPC cable through either the
rear or front hole on the projector. Cap unused hole.
CONNECT PRE-INSTALLED CABLING (PEDESTAL-TO-
HEAD)
Numerous cables are pre-installed within the pedestal and must be routed up to the underside of the
projection head, where they connect to one of three panels (or two IEC power sockets).
NOTE: For all cable connections, keep cable ties that have been trimmed at manufacture. Remove
temporary untrimmed ties that have "tails".